Technical furniture manufacturer Thinking Space Systems have improved the working environment of CCTV operators at Blackburn with Darwen Council, with custom designed control room furniture recently installed within their new CCTV hub.
Thinking Space were awarded the contract to provide control room furniture for the brand-new CCTV hub at Blackburn with Darwen Council. Accommodating four operators and two supervisors, the cool blues and greys for the interior for the room were matched by Thinking Space with their ergonomic furniture, to create a calm and peaceful environment for this 24/7 monitoring station. Of particular interest in this project was the 11 metre spanning Evolution media wall manufactured and installed by Thinking Space. Perfect alignment was key in ensuring the correct sight lines for operators and an aesthetically pleasing finish for the 33 large flat screens, mounted in a configuration of three rows of eleven. Thinking Space used laser positioning technology to achieve an accurate solution.
Blackburn with Darwen Council CCTV hub
The hub was officially opened in March 2017 with Thinking Space invited to the proceedings. Based in King George’s Hall, Blackburn, the new control room monitors over 240 cameras across East Lancashire in a bid to cut crime and make cost savings. Opening the new facility, which had been in operation since the previous month, Assistant Chief Constable Mark Bates and Council leader Mohammed Khan from Blackburn with Darwin Council led the proceedings, hailing the complete project as a resounding success.
Peter Wareing, CCTV Services Manager for Blackburn with Darwen Council explained why communications between all parties ensured its success. “Thinking Space worked closely with both myself and our CCTV installers from day one, providing me with 2D and 3D images of the finished product, allowing me to better convince Partners of the finished article. As the project progressed, Thinking Space were in regular contact with me to ensure that I was receiving exactly what I needed” explained Peter. “The build and install went smoothly, something a project manager looks forward to! The finished article really looks the part and provided that wow factor, with sight lines all taken account of and Operators able to provide an excellent service in comfort.”
See their furniture demonstrations at Stand H1125, IFSEC International from 20-22nd June.