Esser Sm Intruder alarm system control panel
Technical Specification
- Make: Esser
- Model code: Sm
- Accessories: External security operating unit
- Dimensions mm: 85 x 123 x 56
- Operating Temp oC: -25 ~ +55
The external security operating unit consists of a solid die cast housing. The top part of the housing has an electro-mechanical unit for monitoring against drilling. This prevents all forms of unauthorised access to the electronics built into the device. In addition, mechanical tear-off protection and cover monitoring are provided. The "ON / OFF" positions of the key are detected by micro switches. The integrated buzzer and two-colour LED (red / green) are actuated by acknowledgement signals sent by the connected intrusion detection control unit (logic-circuit).
Read moreMake | Esser |
---|---|
Manufacturer | Esser |
Category | Intruder Alarms>Intruder alarm system control panels & accessories |
Model code | Sm |
Accessories | External security operating unit |
Physical Specifications | Dimensions mm: 85 x 123 x 56 |
Environmental Specifications | Operating Temp oC: -25 ~ +55 |
Additional info | The external security operating unit consists of a solid die cast housing. The top part of the housing has an electro-mechanical unit for monitoring against drilling. This prevents all forms of unauthorised access to the electronics built into the device. In addition, mechanical tear-off protection and cover monitoring are provided. The "ON / OFF" positions of the key are detected by micro switches. The integrated buzzer and two-colour LED (red / green) are actuated by acknowledgement signals sent by the connected intrusion detection control unit (logic-circuit). |
Download PDF version Download PDF version |
You might be interested in these products
Related Whitepapers
Security investments retailers should consider for their 2021 budget
A modern guide to data loss prevention
DownloadThe truth behind 9 mobile access myths
Download7 proven solutions for law enforcement key control and asset management
DownloadAccess control system planning phase 2
DownloadSecurity practices for hotels
Download